Energy Management and Greenhouse Gas Emissions

Energy Management

In response to the global trend of energy conservation and carbon reduction, we are committed to enhancing energy management efficiency. We continuously promote energy-saving measures, including improving energy efficiency and introducing advanced energy-saving equipment. We aim to reduce energy intensity by 1% annually, ensuring effective reduction in energy consumption and carbon emissions from production. This commitment underscores our dedication to sustainable development within the industry.

  1. Increased energy efficiency:promote energy/electricity reduction projects in 2023 to lower energy consumption.
  2. Shift toward lower emissions:plan to increase the solar energy system.
  3. Use of recycling:reduce energy-generated waste by reusing and recovering heat energy.
  4. Internal and external cooperation:promote carbon reduction plans with the government, NGO, academic institutions, and professional institutions.

Energy analysis in Taiwan

Type of Energy Use Conversion (GJ)
Electricity Electric power in whole plant 543,196
Natural gas Process requirements 122,345
Gasoline vehicle 1,719
Diesel vehicle / generator 1,770
Total Energy Consumption 669,030
 
Energy Consumption and Intensity
In 2023, the total energy consumption was 669,030.9 GJ, which increased by 3.84% compared to the previous year's consumption of 644,276.31 GJ. This increase was primarily due to an overall increase in production capacity, with total revenue also rising by 5.98%.
 

Energy Reduction Project in Taiwan

2023

Energy Reduction Cost

NT$ 0

Energy Reduction Efficiency

0GJ/year
0tons-CO2e/ year
Year Expense(NT$ thousand) Energy reduction efficiency (GJ/year) Reduce GHG(ton/ year) Energy reduction measures
2021 197 5,242.76 731.41
  1. Water pump for cooling system has 50HP changed to 40HP in plastic cap plant.
  2. Chiller for air conditioning (FI10) install frequency converter.
  3. Energy conservation measures for employees life’s building.
  4. Change diffusers in biological pool.
  5. Add a converter in the blower for the wastewater sludge.
  6. Change the setpoint temperature of the chiller to reduce the working time of the compressor.
2022 175.9 959.42 135.72
  1. Install frequency converter to cooling system for air conditioning, improve the power consumption of compressors.
  2. Water pump for cooling system has 50HP changed to 40HP in plastic cap plant.
2023 10,573 48,478.28 6,665.76
  1. Replace two old chiller at the Taichung 2nd Plant.
  2. Replace two old chiller and one refrigeration brine chiller at the Aseptic 1st Plant.
  3. Replace three old chiller and high-pressure air compression system at the Aseptic 2nd Plant.
2024 Energy Reduction Program
  1. Replace one frequency conversion chiller at Taichung Plant
  2. Replace six frequency conversion high-pressure air compressors at Aseptic 2nd Plant.
  3. Energy-saving transformation of preform injection molding machines with energy-efficient heating systems
  4. Dormitory and factory lighting replaced with energy-saving LED lights

Greenhouse gas (GHG) inventory

In 2021, we initiated a greenhouse gas inventory and obtained an SGS verification statement. The inventory scope includes upstream raw material procurement, upstream raw material transport, downstream product transport, employee commuting, business travel, and waste disposal. In 2023, we expanded the inventory scope to include beverage operations and set 2023 as the baseline year.

2023 GHG Emissions (ton-CO2e/year)

Area Plant Scope 1 Scope 2 Scope 3
Taiwan Taichung 1st and 2nd Plant, Aseptic 1st, 2nd, and 3rd Plant 20062.38 74689.47 3934.44
Comparison of GHG emissions and Intensity in Taiwan from 2020 to 2022
Scope 1

14,477.10ton-CO2e/year

Scope 2

72,099.67ton-CO2e/year

Scope 3

20,026ton-CO2e/year

total emissions

86,576.77ton-CO2e/year

emission intensity

10.8ton CO2e/ revenue (NT$ million)

Scope 1

16,670.38ton-CO2e/year

Scope 2

73,819.05ton-CO2e/year

Scope 3

74,689ton-CO2e/year

total emissions

90,489.43ton-CO2e/year

emission intensity

11.164ton CO2e/ revenue (NT$ million)

Scope 1

20,062.38ton-CO2e/year

Scope 2

74,689.47ton-CO2e/year

Scope 3

195,227ton-CO2e/year

total emissions

289,979.65ton-CO2e/year

emission intensity

10.27ton CO2e/ revenue (NT$ million)

 
  • In-house on-site blow molding strategy for GHG emission reduction benefits :
    The greenhouse gas emission reduction benefits of the in-house on-site blow molding strategy are calculated based on basic assumptions: subtracting the transportation trips of PET bottles from the PET preform trips from the preform plant or Hon Chuan Taichung plant to customer factories. This estimation is reasonably calculated using the carbon emission coefficient for large trucks provided by the Environmental Protection Administration's Product Carbon Footprint Information Network. In total, it is estimated that the transportation emissions reduced in 2023 amount to 200.7 metric tons of CO2e.

  • In 2023, the greenhouse gas emissions intensity for Category 1 and Category 2 decreased by 1.6% compared to the previous year primarily due to improvements in production line efficiency and the benefits of energy-saving measures.

  • Setting Net Zero Carbon Goals and Measures
    In 2022, we declared our net zero carbon emissions target for 2050. The packaging industry has set 2022 as the baseline year, aiming for a 1% reduction in emissions compared to the baseline in 2023. The measures to achieve this goal include:
    1. Improving energy efficiency: Implement energy-saving projects in 2023 to reduce energy consumption by 1%.
    2. Transitioning to low-carbon energy: Contract out the installation of a 1,500 kWp solar photovoltaic system for self-use at our manufacturing plant by 2024.
    3. Internal and external collaboration: Collaborate with government agencies, non-governmental organizations, academic institutions, and professional organizations to jointly promote carbon reduction initiatives.